top of page

Unlocking Stranded Power: A Game-Changer for Data Centers in the AI Era

Updated: Aug 9



In the heart of Data Center Alley, Ashburn, Virginia, a new chapter is unfolding. After two decades of steady growth, data centers have suddenly captured the spotlight, dominating local headlines and sparking heated debates. The crux of the controversy? A tale as old as development itself - the struggle for resources, specifically the electrical power grids capacity to meet the demands of these digital powerhouses.


As utility providers work to upgrade infrastructure, facility and data center managers find themselves at a crossroads. Waiting for new power sources to develop is not an option in today’s marketplace. There is a new strategy that is both innovative and actionable: finding and utilizing stranded power.


The Power Predicament


The urgency of the situation is starkly illustrated by a recent statement from First Energy's CEO that the company currently has 17% energy reserves and that without additional capacity, they will hit zero. This sobering reality is compounded by the fact that data centers can be built far more rapidly than power plants, and that demand for data centers is forecasted to grow by around 10% annually until 2030.


Adding complexity to the problem is the rapid growth of artificial intelligence. AI technologies, with their immense computational requirements, are set to dramatically increase energy demands on data centers. This surge in AI adoption is not just accelerating data center growth but also intensifying the need for more power, further straining our already burdened electrical grids.


Stranded Power: The Hidden Resource


But what if the solution isn't just about generating more power, but better utilizing what we already have? Enter the concept of stranded power - electrical capacity that exists within a facility but remains unused due to inefficient allocation or outdated infrastructure. This untapped resource could be the key to bridging the gap between supply and demand.


Uncovering Stranded Power: Two Approaches


  •  The Broad Stroke: Capacity Analysis This method involves a comprehensive audit of a facility's electrical systems, identifying significant pockets of unused capacity. It's ideal for quick wins and immediate relief.

  •  The Deep Dive: Granular Assessment This approach drills down to the rack and server level, analyzing usage trends to uncover even the smallest bits of stranded power. While more time-intensive, it can yield substantial cumulative savings.


Unity Power Services: Your Partner in Power Optimization


In this critical landscape, Unity Power Services emerges as the right partner for data centers in search of power. Our expertise lies not just in identifying stranded power, but in providing holistic solutions to optimize it.


Our Approach:


  •  Initial Audit: A comprehensive physical electrical assessment, a one-time snapshot

  •  Detailed Reporting: Clear, actionable insights into your power usage

  •  Implementation: Strategies to reclaim identified stranded power

  •  Ongoing Monitoring: Leading tech tools to track usage trends and identify maximum capacity


Beyond the immediate benefits, our services establish a foundation for long-term efficiency. By continuously monitoring and optimizing power usage, we help data centers identify future opportunities for savings and efficiency.


As data center managers and property managers navigate the challenges of increasing power demand, the solution lies in intelligently using what we already have. Unity Power Services stands ready to partner with data centers in this crucial mission - uncovering stranded power, optimizing usage, and paving the way for sustainable growth.

25 views0 comments
bottom of page